Skip to main content

Project Details

  • Client
    MICOPERI
  • Location
    Ravenna
  • Year
    2024

Challenge

Finding a solution for centering piles during driving on the seabed in the Adriatic Sea to build a docking pier for the arrival of a floating FSRU regasification unit off the port of Ravenna.

How did we solve it?

We created a hydraulic system that, through remotely controlled movements, allows the pile to be moved along the X and Y axes and centered at the determined satellite position. The entire system is made up of steel parts hinged and movable with each other, with a total weight of over 70 tons.

Gallery

Innovative and customized solutions in various key sectors

Contact us

For more information or support,
contact us and discover the excellence of Laurini solutions.

    Fields marked with * are required